Libretto Del Ponteggio [exclusive] May 2026
Result: SAFE FOR USE. Next inspection: 22/06/2025.
Inspectors (ASL, INAIL, Carabinieri NAS) routinely check the logbook during site visits. INSPECTION N. 008 – WEEKLY Date: 15/06/2025 – Time: 09:30 Inspector: Ing. Mario Rossi (competent person – cert. n. 123/45) Scaffold ID: Ponteggio Edilizia Nord – Cantiere Via Roma 12 Checks performed: ✅ Base plates and adjustable jacks – no settlement. ✅ Verticality – within tolerance (max deviation 1/300). ✅ All couplers tightened – torque check passed (50 Nm). ✅ Guardrails and toe boards – present and secure. ✅ Access ladder – no damaged rungs. ✅ Ties – all present, no corrosion. libretto del ponteggio