Cctl Vessel Berthing Report [Updated × 2026]

This is a detailed, technical, and operational prepared for a major container terminal (assumed to be a high-volume facility, e.g., within a port like Singapore, Rotterdam, or Shanghai).

The report is structured to provide actionable insights for terminal operations, marine services, and planning departments. Report ID: CCTL-BR-2026-014 Date of Issue: 14 April 2026 Prepared by: Marine & Terminal Planning Dept. Validity Period: 24 hours from issuance (unless updated by VTS/terminal control) 1. Executive Summary This report provides a comprehensive analysis of vessel berthing activities at CCTL (Container Central Terminal Limited) over the last 30 days (16 March – 14 April 2026), along with predictive insights for the next 48 hours. cctl vessel berthing report

Vessel MSC Irina (draught 16.2m) arrived at LW (Low Water) –0.2m chart datum. Required UKC not met. Waited 3h 20m for tide rise → missed crane gang shift → total delay 5h. This is a detailed, technical, and operational prepared

B4 crane failures cause 1.2 hours avg delay per feeder vessel. B3 crane failures increasing. Action: Prioritize B4 crane replacement Q3 2026. Until then, re-route feeders requiring >30 moves to B3 during night shift. 6. Predictive Berthing Schedule (Next 48h) Based on real-time AIS, tide tables, and terminal operating system (TOS) queue. Validity Period: 24 hours from issuance (unless updated

| Time (UTC) | Berth | Vessel | Draught | Est. Moor | Est. Unmoor | Confidence | |------------|-------|--------|---------|-----------|-------------|-------------| | 14 Apr 22:00 | B1 | CMA CGM Jacques Saadé | 15.8 | 22:30 | 15 Apr 10:00 | High | | 15 Apr 01:30 | B2 | ONE Trust | 15.2 | 02:15 | 12:30 | Medium (tide) | | 15 Apr 04:00 | B3 | MSC Nicole | 12.5 | 04:20 | 09:00 | High | | 15 Apr 07:45 | B4 | X-Press Jersey | 8.9 | 08:00 | 12:00 | High | | 15 Apr 11:30 | B1 | HMM Rotterdam | 16.0 | 12:45 | 22:30 | Low (vessel delayed at anchorage) |